JavaScript is off. Please enable to view full site.

U.S. government shutdown holds up FAA approval of aircraft, routes

U.S. government shutdown holds up FAA approval of aircraft, routes

Tuesday, January 15, 2019, 11:25 GMT+7
U.S. government shutdown holds up FAA approval of aircraft, routes
A traveler checks her baggage at the Southwest Airlines terminal at LAX airport in Los Angeles, California, U.S., January 24, 2017. Photo: Reuters

Federal Aviation Administration (FAA) approval of aircraft such as Boeing’s MAX and new routes like Southwest Airline Co’s Hawaii launch are on hold due to the U.S. government shutdown, delaying commercial operations.

On Monday, Southwest Airlines said its plans to launch service to Hawaii early this year are on hold because the FAA groups that oversee the route authorization process are on furlough.

In a statement, Southwest said it will not announce any timelines for selling or operating flights to Hawaii until it receives the necessary authorization.

A partial U.S. government shutdown over President Donald Trump’s demand for $5.7 billion to build a wall along the U.S.-Mexico border entered its 24th day on Monday.

Talks between Trump and congressional Democrats remained stalled even as some of his fellow Republicans called on the president to cut a deal, as tension mounted nationwide.

The partial government shutdown is also affecting the certification program for U.S. business jet maker Gulfstream Aerospace’s new G600 corporate plane, along with other “facets of our business,” a company spokeswoman said on Monday by email, without providing further details.

Savannah-based Gulfstream, a division of General Dynamics Corp. had previously expected to obtain FAA certification or approval for the G600 by late 2018. The long-range business jet, which can fly nonstop from London to Los Angeles, is expected to enter service this year.

Meanwhile, no. 1 U.S. carrier American Airlines Group Inc said it has taken delivery of two new MAX 8, but the planes are sitting idle in Tulsa, Oklahoma awaiting FAA approvals required for commercial operation.

American, with a fleet of around 950 aircraft, said it did not see any impact from the delay on its flight schedule or customers.

A spokesman for United Airlines said the No. 3 U.S. carrier is waiting for FAA service to be restored so it can enter one 737 MAX 9 and one used Airbus A319 into service. Delta Air Lines, which is also awaiting FAA certification of new aircraft, did not immediately reply to a request for details.

Analysts said they did not expect a major impact on large airlines’ capacity as a result of FAA certification delays, but will be awaiting management comments about the effect of a prolonged shutdown on travel and operations during fourth-quarter conference calls.

Reuters

More

Read more

;

Photos

VIDEOS

‘Taste of Australia’ gala dinner held in Ho Chi Minh City after 2-year hiatus

Taste of Australia Gala Reception has returned to the Park Hyatt Hotel in Ho Chi Minh City's District 1 after a two-year hiatus due to the COVID-19 pandemic

Vietnamese woman gives unconditional love to hundreds of adopted children

Despite her own immense hardship, she has taken in and cared for hundreds of orphans over the past three decades.

Vietnam’s Mekong Delta celebrates spring with ‘hat boi’ performances

The art form is so popular that it attracts people from all ages in the Mekong Delta

Vietnamese youngster travels back in time with clay miniatures

Each work is a scene caught by Dung and kept in his memories through his journeys across Vietnam

Latest news