JavaScript is off. Please enable to view full site.

NASA Moon mission 'exceeding' expectations

NASA Moon mission 'exceeding' expectations

Sunday, November 20, 2022, 10:07 GMT+7
NASA Moon mission 'exceeding' expectations
Photo: AFP

On the third day after lifting off from Florida bound for the Moon, the Orion spacecraft is "exceeding performance expectations," NASA officials have said.

The spacecraft is to take astronauts to the Moon in the coming years - the first to set foot on its surface since the last Apollo mission in 1972.

This first test flight, without a crew on board, aims to ensure that the vehicle is safe.

"Today we met to review the Orion spacecraft performance... it is exceeding performance expectations," said Mike Sarafin, head of the Artemis 1 mission.

The spacecraft's four solar panels, about four metres long, deployed correctly and are providing more energy than expected, said Jim Geffre, the Orion manager at the Johnson Space Centre in Houston.

It is from that control centre in Texas that the spacecraft is being piloted.

Orion is already some 320,000km from Earth and preparing to perform the first of four main thrusts scheduled during the mission using its engines.

This maneuver, which will take place early Monday morning, will bring the spacecraft as close as 130km from the lunar surface, in order to take advantage of the Moon's gravitational force.

Since this will take place on the far side of the Moon, NASA is expected to lose contact with the spacecraft for approximately 35 minutes.

"We will be passing over some of the Apollo landing sites," said flight director Jeff Radigan, although they will be in darkness. Footage of the flyover will be released by NASA.

Four days later, a second thrust from the engines will place Orion in a distant orbit around the Moon.

The ship will go up to 40,000 miles beyond the Moon, a record for a habitable capsule.

It will then begin the journey back to Earth, with a landing in the Pacific Ocean scheduled for 11 December, after just over 25 days of flight.

The success of this mission will determine the future of the Artemis 2 mission, which will take astronauts around the Moon without landing, then Artemis 3, which will finally mark the return of humans to the lunar surface.

Those missions are scheduled to take place in 2024 and 2025, respectively.

Sarafin also said yesterday that ten scientific micro-satellites had been deployed when the rocket took off, but that half of them were experiencing technical or communication problems.

Those experiments, carried out separately by independent teams, will have no impact on the main mission, however.

AFP

More

Read more

;

Photos

VIDEOS

‘Taste of Australia’ gala dinner held in Ho Chi Minh City after 2-year hiatus

Taste of Australia Gala Reception has returned to the Park Hyatt Hotel in Ho Chi Minh City's District 1 after a two-year hiatus due to the COVID-19 pandemic

Vietnamese woman gives unconditional love to hundreds of adopted children

Despite her own immense hardship, she has taken in and cared for hundreds of orphans over the past three decades.

Vietnam’s Mekong Delta celebrates spring with ‘hat boi’ performances

The art form is so popular that it attracts people from all ages in the Mekong Delta

Latest news