JavaScript is off. Please enable to view full site.

Britain's new 3 billion pound warship has a leak

Britain's new 3 billion pound warship has a leak

Tuesday, December 19, 2017, 15:25 GMT+7

LONDON -- Britain’s biggest ever warship, the new 3.1 billion pound ($4.2 billion) aircraft carrier HMS Queen Elizabeth, has a leak and needs repairs, the Ministry of Defence (MoD) said on Tuesday.

The 65,000-tonne ship, hailed as Britain’s most advanced military vessel and which was only officially commissioned by the queen two weeks ago, has an issue with a shaft seal which was identified during sea trials, the MoD said.

“This is scheduled for repair while she is alongside at Portsmouth,” a Royal Navy spokesman said. “It does not prevent her from sailing again and her sea trials program will not be affected.”

The Sun newspaper reported that the 280-metre (920-foot) warship was letting in 200 liters of water every hour and the fix would cost millions of pounds.

A defense source said the navy was aware the ship, which took eight years to build, had an issue when it was handed over by manufacturers and the Sun said the builders would have to foot the repair bill.

The Aircraft Carrier Alliance - a consortium including British engineering companies BAE Systems and Babcock, and the UK division of France’s Thales - built the Queen Elizabeth and its sister aircraft carrier, the HMS Prince of Wales, as apart of a 6.2 billion pound project.

No one from the Aircraft Carrier Alliance was immediately available for comment.

“Every ship takes on water. That’s why you have pumps,” Chris Parry, former senior Royal Navy officer told Sky News.

“When you get a brand new car not everything’s perfect, you have to send it back to the garage to get a few things tweaked. This is exactly in that bracket.”

On Tuesday, parliament’s defense committee raised questions about the procurement of the F-35 fighter jets from a consortium led by Lockheed Martin which will eventually operate from the Queen Elizabeth.

The committee said there had been an “unacceptable lack of transparency” about the program and the MoD had failed to provide details of the full cost of each aircraft which one newspaper had estimated could be as much as 155 million pounds.

“Our new aircraft carrier is the epitome of British design and dexterity, at the core of our efforts to build an Armed Forces fit for the future,” British Defence Secretary Gavin Williamson said at the Queen Elizabeth’s commissioning.

Reuters

More

Read more

Japan 'poop master' gives back to nature

When nature calls, Masana Izawa has followed the same routine for more than 50 years: heading out to the woods in Japan, dropping his pants and doing as bears do

1 week ago
;

VIDEOS

‘Taste of Australia’ gala dinner held in Ho Chi Minh City after 2-year hiatus

Taste of Australia Gala Reception has returned to the Park Hyatt Hotel in Ho Chi Minh City's District 1 after a two-year hiatus due to the COVID-19 pandemic

Vietnamese woman gives unconditional love to hundreds of adopted children

Despite her own immense hardship, she has taken in and cared for hundreds of orphans over the past three decades.

Latest news